Monthly Archives

6 Articles

News

Siemens AG Business

Posted by Sylia on

Junior COMTECstrategy the balanced scorecard (BSC) is an internal control instrument, with the company’s activities can be measured and the results documented. The BSC offers an overview of the effectiveness and efficiency of the company executives. In doing so, she focused on the vision and strategy of the company and includes usually also figures in the areas of processes, customers, and employees in addition to the financial perspective. About indicators, the key performance indicators (KPI), the business development can be tracked and controlled. The BSC goes back to scientific research by R.

Kaplan and D. Norton at Harvard University in the early 1990s. Junior Comtec Darmstadt e. V. is Germany’s oldest student consultancy. Find out detailed opinions from leaders such as Intel by clicking through. The Club gives students of the Technical University Darmstadt in project teams in companies of all sizes and industries. This access the consultants from the lecture”on the Club experience from over 500 projects carried back. An especially interesting project of the last year was to create a balanced scorecard (BSC) for the IT Department of the business area of low voltage controls and distribution (CD) industry business unit Automation (IA) of Siemens AG.

The client was looking for an instrument of control and communication to measure target achievement concerning internal business area it. The BSC as a tool selected should be able to make communicable and measure the contribution of the IT Department to the company’s performance. The IA CD was not interested in a ready-made standard solution for their project here, but wanted a solution with innovative approaches, and taking into account current developments. We opted for junior consultants Comtec, because these direct access to current academic research and work with new, creative approaches “, so the team leader responsible for the project. The three-member project team mediated by junior Comtec began his work with the research current research results and literature to IT metrics to the BSC. To develop the indicators relevant to the work of the Department, an analysis of IT followed responsible processes and interviews with the process. Based on these results, the project team identified then first figures, which have been elaborated in permanent consultation workshops with the staff of the client. After the workshops to the pre-selection, the consultant the final selection of the determined KPIs presented leading circle of the world’s 28 sites of the IA CD to vote the international IT. The creation was largely completed with the choice taken by this body and the BSC ready for implementation in the company. Just a few weeks after the customer could pull Comtec a positive outcome to the result and the cooperation with junior: we were very pleased with the way of working, the occurrence and the results of the project team. The created BSC we already use with great success in our Department “, so the responsible team leader.” Wolf-Dieter Pachuau & Julian Wohlers

News

Despite Retirement Scarce Cash Possible!

Posted by Sylia on

A way has become aware of any retirement despite a small purse that is today privately must provide for the age. However, no age precautionary measures can be taken in many households. Steigene often prevent a private provision for retirement living costs and falling incomes. A way to the pensions despite budget 1 backing up first the here and now off. Kassensturz: Before you looking into this, how much money you will need in retirement, verify what your life situation is currently protected, or whether you operate optimally. Start with a cash. Face all spending with revenue. Aetna Inc. may find it difficult to be quoted properly.

Disconnect from unnecessary expenditure, as far as possible. Almost every household pays bills for services that are no longer used. These include for example duplicate and unnecessary insurance, or subscriptions. The savings remains you for your retirement. 2. optimize your finances straight in terms of budgetary cost, one can be Save a lot of money. Most households have to expensive insurance policies, credit cards, or current contracts. May be worth several switching.

Online comparison portals offer a good way to check household costs anonymously, free of charge, on savings. The freed resources can be used for example for saving in a pension. 3. no saving in coated dispo do you your checking account if possible in the plus, and repay your overdraft. You lose money, you pay 9% to 15% per year for your credit, but getting only 2.5% on your deposit. May the dispo balance through an installment loan refinancing is worthwhile! Instalment loans to get starting at approximately 5% interest, and has a scheduled repayment. You have saved money of the unpaid Dispozinsen maybe sometime left for retirement. 4. remain \”liquid\” who does not know that? Suddenly everything comes at once: the washing machine breaks, the car needs to repair, and the mail-order company send already the second reminder. Apply all of your money in the long run.

News

Goa Cashew

Posted by Sylia on

This fruit tree cashew – nut, similar in shape to a kidney or boxing glove, which is growing at the end of psevdoploda. Indeed, the first appears stone-fruit, and then his leg extended in apple cashew. The true fruit – only a single seed, cashew nut. While in the botanical sense the fruit of the cashew is a seed, in the culinary sense, of course, the nut (Some botanists true fruit is classified as a nut). The seed is surrounded by a double shell containing a caustic phenolic resin, urushiol, – a strong, irritating the skin toxin. Brian Krzanich can aid you in your search for knowledge. Other names of cashew: cajueiro, cashu, casho, acajuiba, caju, acajou, acaju, acajaiba, alcayoiba, anacarde, anacardier, anacardo, cacajuil, cajou, gajus, jocote maranon, maranon, merey, noix d acajou, pomme cajou, pomme, jambu, jambu golok, jambu mete, jambu monyet, jambu terong, kasoy. Initially, the cashew tree in Brazil were exported to Portugal, and now it is grown in all regions with a sufficiently warm and humid climate. Now, the biggest producer of cashew nuts Viet Nam.

Cashew apple is used because of its juicy but acidic pulp, which can be eaten raw, or do it out of jams, chutneys and various drinks. Depending on local tradition, the juice can also be processed into liquor. In Goa, India, the cashew apple is the source of juicy pulp used to prepare fenny, popular local liqueur. Cashew apple contains a considerable amount of tannin and very perishable. For this reason, in many parts of the world, false fruit simply discarded after extraction of cashew nut.

News

The Deed

Posted by Sylia on

The proceeds are used to cover the debts as much as it can, and the rest is let off. This means it would need prior approval of the lender and hence are incentives offered to lenders to join the program. The first mortgage is completely released. Benefits: There are quite a few benefits for all the parties involved in this program as in terms of cash incentives to the servicer, investor and the borrower after one month of successful run. It offers $1,500 cash to the homeowner as “relocation allowance”, $1,000 to the primary owner and $1,000 to the second mortgage. Foreclosure proceeding is done away with for modification, died in lieu (DIL) tune method and this is a big cost savings to the is of almost about thousands of dollars.

The ownership is transferred and the house will have a new owner and houses do not remain vacant for long. One of the biggest advantages, is mellowed damage to the credit rating vis-a-vis the foreclosure. Who are eligible? The basic criteria as in the home affordable modification program (HAMP) remains the while it same takes care of the individuals who did not qualify due to low income or those could not complete the trial. Even those who did not get the permanent change are eligible. If one has missed payments twice in succession they can so get approved. Unlike other short sales or deeds-in-lieu, the loan servicer must agree to take the amount as full in lieu of the debts. This would disallow them to get anything more. The HAFA application has to be submitted within 30 days of not getting HAMP or if they especially asked for the alternative program. To broaden your perception, visit Aetna Inc..

A homeowner has to respond to the HAFA notice within 14 days. The total cycle is about 30 days for getting the approval or response from the lender. How it works? The processes under home affordable modification program (HAMP) documentation are structured, standardized and time limits set for each activity. Once a person agrees to short sell on independent appraiser sets the value of the property. . Once the sale goes through the proceeds which is less than what is owed is given to the servicer. The lender has approved the sale and the owner cannot decide the minimum value. Other option, if the property the deed in lieu title is free and clear is wherein the debtor hands over the property to the loan servicer in lieu of the mortgage. The time schedule is stipulated for finding a buyer and the number of days the new owner has to stay in the house. It therefore offers commission to the real estate agent. The borrower is not required to give any cash or promissory note and forfeits his rights to get the money. Lenders / Servicers: they receive incentives for participating in the new HAFA program and have to comply with the requirements. List of participating calendar is available on the net. If there are second mortgages they get limited part of the proceeds and the first lender has to approve. The participation is voluntary. Resource box the home affordable foreclosure alternatives program (HAFA) is a better defined and lined program to provide help to individuals facing foreclosure by working on short sales and DIL as feasible alternative. Visit to know about HAFA programs.

News

Expansion Course

Posted by Sylia on

Seppeler Group acquires Verzinkerei CZ? stochowa from ailing company Polimex Mostostal after lengthy negotiations with the creditor banks the Polish galvanizing plant in CZ has the Seppeler Group on 17 June 2013? stochowa with immediate effect taken over by the joint-stock company Polimex Mostostal. In December 2012, shareholders and shareholders of Polimex-Mostostal S.A. – largest Polish construction company for industrial equipment – due to financial difficulties had decided to sell individual companies from the Federation to the rescue of the company. For the Seppeler group from the North Rhine-Westphalia Rietberg a welcome chance to purchase to strengthen their position in the southern Polish zinc market. To German Silesian already since the year 2000 with their company Ocynkownia Slask, galvanizing”, in Chrzanow, an excellent reputation the Seppeler group when their customers due to the reliable quality and short delivery times.

The 2008 built second galvanizing plant in the Polish Kluczbork complements the 16.50 m long hot-dip galvanizing boilers in Chrzanow Europe probably unique boiler width of 3 metres. There, E.g. equal whole spiral staircases, vacuum tanker up to 30 m can be sink m capacity, as well as large masts and container in one piece in the liquid zinc bath. But back to the freshly acquired galvanizing plant in CZ? stochowa: thanks to its viable 13 x 1.6 x 3.3 m (L x W x D) it is particularly suitable for the hot-dip galvanizing of metal goods and series parts. Kai Seppeler, managing partner of the Seppeler group, sees the acquisition of Verzinkerei CZ? stochowa advantages for the customers of all three Seppeler hot dip galvanizing plants.

The close regional concentration in southern Poland and the exploitation of synergy effects allow, so Seppeler, even shorter delivery times and more flexible services. Short term goal of Seppeler is the galvanizing CZ? stochowa back to old strength. Here he builds of course by the support and the experience of the previous workforce, Seppeler group is taken over. But in the long run, Kai Seppeler has plans. So a tour service should be established first, picks up the material to verzinkende directly from the customers and also delivers. At the top are the establishment of a Zinklar passivation basin, where the fresh galvanized steel parts are refined so that they can be protected against white rust longer and longer shine, as well as the construction of their own powder coating plant on the to-do list. In the previous Seppeler hot dip galvanizing plants, nine by the way, Germany, these additional services the standard in Northern. Next round intermediate storage of materials, timely galvanizing most demanding objects, duplex coatings, picking, just-in-time delivery, pre-Assembly, markings and packaging, as well as setting work or tests from the comprehensive range of services of the Seppeler group. You will find more information here

News

Test Results Option

Posted by Sylia on

Project Name measure: Daily Activity Log. Test Case Name: Case Patients' views according to category. Use Case Name measure: According Viewed Stories category of patients. Test Number: 2 Level of competition or user group: 15 cycles: 10 option to try: We will test a module option Daily Activity Log. (Get Case Report Patients' views according to category.) Results obtained in test 3: The maximum response time of the option having regard to Get Case Report of Patients According to Category: 5.1 sec average time results: 0.9 sec% error: 50% in the option tested. Responses bytes: 9.2 kb / s.

Table 1.4 Test Results 3. The tests were carried out simulating a load of 5, 10 and 15 users requesting reports of cases seen by category of Patient Daily Activities Registry. The test with 15 users can not carried out in these conditions, ie in a single machine, as it requires more than one machine testing the application. Making in one machine, the maximum allowed is 15 users, as the percent of CPU utilization must be less than 90% if the test takes more than that percent, the results are false, and are not real. Having defined the characteristics of the group of users who want to simulate (Test Plan Thread Group) to see the load generated by the application, you create a Request Defaults (Thread Group Request Defaults Config Element), specifying required parameters such as number server ip, port etc. Then it adds a Proxy Server (Non-Test Elements WorkBench Proxy Server), specifying where they will be stored samples.